MCP server · In practice

Your AI assistant now knows Swiss spatial development.

You ask a question in the chat. Your assistant fetches official geodata and legal bases and calculates with methods SPEKTRUM has developed from planning practice: building zone capacity, permit pre-check, value capture, weighing of interests. Every statement with a source.

148tools in 9 services
26cantons with thematic maps
2,110municipalities with building zone capacity
2,078municipalities with recorded building regulations, 1,829 of them complete
i

Building regulations are recorded continuously, by building zone area: the largest municipalities first. Need a specific municipality? On request we move it up the queue, usually within a few days.

What applies to the plot at Bahnhofstrasse 12 in Uster, and which hazards are recorded?
Tools called✓swisstopo_search✓swisstopo_get_egrid✓oereb_get_extract✓get_naturgefahren✓get_gewaesserraum · get_laermempfindlichkeit✓get_denkmalschutz

Plot B7635 in Uster ZH, 460 m², EGRID CH267731069777.

  • Zone: core zone Kirchuster (K3/4) on the whole plot; the land-use plan is under revision, a change with anticipatory effect is recorded
  • Building lines: municipal traffic building lines
  • Noise: sensitivity level III
  • Natural hazards: no hazard in the synoptic hazard map
  • Water area: not affected; heritage: no objects within 30 m

Because of the anticipatory effect, consult the ongoing land-use plan revision before giving information.

Sources: ÖREB cadastre ZH (binding), GIS-ZH hazard map, water area and heritage objects
Real queries of 14.10.2026, shortenedFull example

The SPEKTRUM MCP connects AI assistants via the open Model Context Protocol to 148 tools for Swiss spatial development: federal geodata and the cadastre of public-law restrictions (ÖREB), cantonal thematic maps, building zone capacity, building permit pre-check, value capture, weighing of interests, EIA screening, case law, federal and cantonal law, procedure profiles for all 26 cantons, noise comparison and calculators for floor-area ratios, setbacks and shadow. Beyond access to official data it contains its own calculation and check methods, recorded building regulations and curated legal sources, developed by SPEKTRUM Partner GmbH in Zurich under the lead of Andreas Rupf, spatial and urban planner and lecturer in the MAS and CAS in Spatial Development at ETH Zurich.

Last updated: 16 November 2026 · Responsible: Andreas Rupf, SPEKTRUM Partner GmbH

How it works

From the chat to the official source and back.

The MCP server connects your existing AI assistant to the planning data. You connect it once. From then on, the assistant decides for each question which tools it needs.

  1. YOU

    Question in the chat

    In plain language, as you would ask a colleague. With address, municipality or plot number.

  2. ASSISTANT

    Claude, ChatGPT & Co.

    Understands the question, plans the steps and calls the right tools.

  3. MCP.SPEKT.CH

    SPEKTRUM MCP

    SPEKTRUM’s own calculations, check rules and recorded regulations. 9 services, 148 tools.

    ch-bundbauzonegis-zhgis-kantoneortsplanungspektrum
  4. SOURCES

    Official data

    swisstopoÖREB cadastrecantonal geoportalsGWRcantonal lawFederal Supreme Court
  5. RESULT

    Answer with references

    Summary, calculation, feasibility study or draft report. Every statement with a source you can check.

↺ back to the chat, with sources

Connect once

Add the address as a connector in your assistant and sign in once. No coding, no API key in the chat.

The assistant chooses

You do not need to know tool names. For a plot question it combines geodata, zoning plan and hazard map itself; for a feasibility study it chains site, building regulations, variants, noise and the neighbourhood in 3D.

You decide

The AI prepares and calculates. Review, weighing and signature stay with you.

SPEKTRUM know-how

More than a data connection.

Official data is plentiful. The difference lies in what is calculated and checked with it. SPEKTRUM developed the planning logic behind it itself, from local plans, expert opinions and building permits, and tests it on real cases.

Your assistantClaude, ChatGPT, Copilot

understands the question and writes the answer

SPEKTRUM planning logicdeveloped by SPEKTRUM

calculation methods, check rules, recorded building regulations, curated law and report templates

Official dataConfederation, cantons, courts

swisstopo, ÖREB cadastre, cantonal geoportals, statistics, laws, rulings

Developed by SPEKTRUM

Calculation

Building zone capacity under Art. 15 RPG

Calculation model following common cantonal methodology, implemented by SPEKTRUM with an auditable deduction cascade: crop rotation areas, water area, forest, natural hazards and ÖREB are shown one by one, mobilisation and population forecast included. For every Swiss municipality.

Check rules

Building permit pre-check

Standard building rules checked against regulations SPEKTRUM recorded by hand from the parameter tables and harmonised to IVHB, plus parking demand under VSS and deadline plans with paragraphs and public holidays.

Calculation

Value capture

Calculation of the planning gain under cantonal law with zone factors per municipality, for single plots or whole areas in one run.

Method

Weighing of interests under Art. 3 RPV

Five specialised AI agents work through the weighing step by step: identify, assess and weigh interests, with evidence from law and case law.

Check rules

EIA screening

Check of the EIA obligation against the thresholds of the EIA Ordinance, with checklist, cantonal procedural law and a cross-check against rulings.

Assessment

Site analysis

Assessment logic for eight topics with traffic light, finding, source and legal basis; noise against the limits of the revised noise law, air quality against the LRV; data gaps never turn green.

Method

Feasibility study

The tools in one chain: site, standard building rules from the recorded regulations, variants against the existing building from the building register, noise per facade and the neighbourhood in 3D with the plot highlighted in red. For one plot or a perimeter of several plots.

Method

Scenarios & variants

Comparison of up to eight variants against the zero option with its own rule set for strengths and weaknesses, RPG check, demand coverage and a map from the official survey; plus the neighbourhood building by building as a 3D model with a scenario to 2070.

Knowledge base

Case law and reports

Curated collection of planning rulings with headnotes, cantonal law and structure plan texts in full, and templates for the Art. 47 RPV planning report, council proposals and participation reports.

Developed and maintained by Andreas Rupf, spatial and urban planner and lecturer in the MAS and CAS in Spatial Development at ETH Zurich, SPEKTRUM Partner GmbH. The methods are based on many years of experience in Swiss spatial planning and are continuously developed further.

Day to day

Fewer windows, more planning work.

Using a first assessment of a plot as an example.

Today

  1. Look up the address in the geoportal, note plot and EGRID
  2. Order the ÖREB extract as PDF and read it
  3. Check hazard map, water area and noise level each in a separate map
  4. Look up zone parameters in the building regulations (PDF)
  5. Collect everything in Word, add sources by hand
Five applications, many breaks in between

With the SPEKTRUM MCP

  1. Ask the question in the chat
  2. The assistant fetches plot, ÖREB, thematic maps and zone parameters
  3. Check the answer and sources, ask follow-ups, use it as a note or draft
One window, all sources named

Time

Checks that take several portals, in one step of the conversation.

Traceable

Every statement names the dataset, legal article or ruling.

One place

Geodata, law and calculation combined in the same conversation.

One account

Sign-in via OAuth, no API key in the chat, a personal login for each person in the firm.

What you can do

Nine fields, one connection.

Typical questions and one worked example each. Seven are real queries, all answers are shortened.

1Plot & property

Everything that applies to a plot, in one answer.

An address or plot number is enough. The assistant determines location and EGRID, fetches the ÖREB extract and overlays the cantonal thematic maps: zone, natural hazards, water area, noise, heritage protection, crop rotation areas, public transport quality. The plot can be exported as GeoPackage, GeoJSON, KML or DXF for QGIS and CAD, on request with the area outside the boundary distance.

SPEKTRUM methodQueries bundled across all cantons: the assistant receives the ÖREB extract and cantonal thematic maps in one consistent structure, however each geoportal is built.
  • Which public-law restrictions are recorded on plot 4711 in Wil SG?
  • Is the property within the water area or a hazard zone?
  • How many dwellings are there within 300 m?

Services: ch-bund, gis-zh, gis-lu, gis-gr, gis-kantone (all 26 cantons via the thematic map dossier)

Examplereal query of 14.10.2026, shortened
What applies to the plot at Bahnhofstrasse 12 in Uster, and which hazards are recorded?
swisstopo_searchswisstopo_get_egridoereb_get_extractget_naturgefahrenget_gewaesserraum · get_laermempfindlichkeitget_denkmalschutz

Plot B7635 in Uster ZH, 460 m², EGRID CH267731069777.

  • Zone: core zone Kirchuster (K3/4) on the whole plot; the land-use plan is under revision, a change with anticipatory effect is recorded
  • Building lines: municipal traffic building lines
  • Noise: sensitivity level III
  • Natural hazards: no hazard in the synoptic hazard map
  • Water area: not affected; heritage: no objects within 30 m

Because of the anticipatory effect, consult the ongoing land-use plan revision before giving information.

Sources: ÖREB cadastre ZH (binding), GIS-ZH hazard map, water area and heritage objects
2Site analysis

A traffic light per topic, for every plot.

An address or coordinate is enough. The site analysis combines the ÖREB cadastre, federal geodata and cantonal thematic maps into a traffic light for eight topics: planning law and zone, noise, air quality, natural hazards, water and groundwater, nature/landscape/heritage, contaminated sites and major-accident prevention, public transport. With an overall picture and a report to work with.

SPEKTRUM methodAssessment logic with traffic light, source and legal basis per finding; road and rail noise checked against the limits of the revised noise law, air pollutants (NO₂, PM10, PM2.5) against the immission limit values of the LRV; data gaps count as «not checkable», never green.
  • Run a site analysis for Schachenstrasse 10 in Kriens.
  • Where does this site need further clarification?
  • How well is the plot served by public transport?

Services: bauzone, with ch-bund and the cantonal geodata

Examplereal query of 14.10.2026, shortened
Run a site analysis for Schachenstrasse 10 in Kriens.
standortanalyse

Plot 443 in Kriens LU, 1,449 m², centre extension zone, noise level III, public transport class A (bus stop 89 m away).

  • Green: planning law and zone, noise (road 58/45 dB(A), planning value met), water and groundwater, nature and heritage, public transport
  • Yellow, natural hazards: zone with building conditions, medium hazard on the hazard map, area for detailed hazard assessment
  • Yellow, accident prevention: consultation area along a through road, soil relocation check perimeter

Shown openly as not checked: rail noise, subsoil, easements and standard building rules.

Sources: ÖREB cadastre LU (binding), thematic maps canton of Lucerne, sonBASE noise model FOEN, ARE public transport classes
3Feasibility

From an address to a feasibility study, in one conversation.

A client asks what is possible on their plot. The assistant chains the tools: site analysis, measures from the building regulations, variants with floor area and parking, noise on every facade and the neighbourhood in 3D with the plot highlighted in red. The result is a first draft of a feasibility study with a source for every figure, as the basis for a quote and the project start.

SPEKTRUM methodFive tools in one chain, every figure with its source and level of authority (binding, indicative, working aid). The existing building from the building register is held against the standard building rules. Where the regulations use a different measure, such as a building mass ratio instead of a floor area ratio, the system does not convert silently but marks the check as open.
  • What could be built on the plot at Kienastenwiesweg 41 in Zurich?
  • Compare adding storeys and a replacement building with the existing building.
  • Summarise this as a feasibility study for the client.

Services: bauzone, with ch-bund and the cantonal geodata

More on the feasibility study: chain, example, limits
Examplereal query of 26 Oct 2026, shortened
What could be built on the plot at Kienastenwiesweg 41 in Zurich? Check the site, the standard building rules, noise and the neighbourhood.
standortanalysebaureglement_abfragenlaerm_vergleichquartier_3d

Plot WI3065 in Zurich-Witikon, 813 m², residential zone W3, public transport class B, bus 225 m away. Today a detached house from 1971 with 2 storeys and a heat pump; with an annex about 390 m² of floor area, 1 flat.

  • Standard building rules (BZO Art. 13 and 14): 3 full storeys and 1 roof storey, building height 9.5 m, floor area ratio 0.9; boundary distance 5 m plus one third of the facade length above 12 m
  • Noise: planning value met on all sides, more than 23 dB in reserve
  • To clarify: municipal road building line; safety zone and obstacle limitation of Zurich Airport, a new perimeter is on public display; consultation area of a pipeline
  • Neighbourhood within 300 m: 133 buildings, 3.6 storeys on average, almost entirely W3

The plot uses about 40 % of its allowance today (ratio 0.36). How much of the rest can be built shows the volume study with boundary distances.

Sources: ÖREB cadastre ZH (binding), BZO Zurich 2016 (as of 15 Apr 2026), building register and official survey, sonBASE noise model FOEN, ARE public transport classes, Sectoral Aviation Infrastructure Plan (FOCA)
Examplereal query of 26 Oct 2026, shortened
Compare two ways of adding a storey and a replacement building as building volumes in 3D, with boundary distance.
vergleiche_varianten
Preview: choose a variant, rotate, zoom; existing in grey, new storeys in yellowFull view ↗

According to the cadastral survey the house stands on the boundary for about 13 m. The tool checks new storeys against the boundary distance and the extra distance for long facades; floor area ratio under § 255(2) PBG ZH.

  • Variant A, storey added within the distances: set-back storey of about 90 m², total about 435 m², ratio 0.46, met
  • Variant B, storey added on the whole existing footprint: about 510 m², ratio 0.54; boundary distance «to clarify»: only under existing rights in § 357(1) PBG ZH, subject to a weighing of interests
  • Variant C, replacement with 3 storeys and a roof storey: about 740 m², 7 flats, ratio 0.65; position and orientation chosen so that the largest area fits; 7 m boundary distance in front of the 18 m facade
  • The zone would allow about 1,000 m²; under the standard rules about 740 m² fit on the plot

Conclusion: the replacement yields the most and keeps all distances. Adding a storey on the whole footprint is a question for the permit; the set-back storey needs no exception but yields little.

Sources: official survey and building register (existing), BZO Zurich Art. 13 and 14, §§ 255 and 357 PBG ZH; storey heights of 3.0 m assumed. Volume study, not a project.
4Building zones & local planning

Building zone capacity under Art. 15 RPG, for every municipality.

Calculate reserves and capacity, compare them with the cantonal population forecast, weigh variants and draft the planning report under Art. 47 RPV or a council proposal. Plus the floor area reserve plot by plot for a whole municipality as a heatmap, with population capacity up to 2040 and 2050.

SPEKTRUM methodCapacity calculation with deduction cascade and mobilisation, variant comparison and report templates under Art. 47 RPV.
  • Is Hinwil’s building zone sufficient for growth up to 2040?
  • Compare upzoning and rezoning for the area Bahnhof Süd.
  • Draft the chapter on building zone sizing for the Art. 47 report.
  • Where are the largest floor area reserves in our municipality?

Services: bauzone

Examplereal query of 14.10.2026, shortened
Is Hinwil’s building zone sufficient for the expected growth up to 2040?
suche_gemeindehole_bevoelkerungsprognoseberechne_bauzonenkapazitaet

Forecast (FSO medium scenario): from 11,961 residents in 2024 to 13,486 in 2040, about 1,525 more.

  • Undeveloped building zone according to ARE statistics: 28.3 ha, of which 19.0 ha are employment zones
  • With all reserves, capacity lasts for about 18 years on paper
  • Residential and mixed zones only (9.3 ha): room for about 590 additional residents, covering roughly 6 years

For housing, the calculation shows a shortfall. Next step: check vacant plots (upper ARE estimate 48.6 ha) and densification in built-up areas.

Sources: ARE building zone statistics 2022, FSO STATPOP and population scenarios; default assumptions floor area ratio 0.5, 55 m² per person, mobilisation 70 %
Examplereal query of 26.10.2026, shortened
Where are the floor area reserves in Sursee, plot by plot?
reserven_gemeinde
Preview: click plots, filter by zone, reserve or utilisationFull heatmap ↗

Sursee, 1,442 plots in building zones (155.5 ha); based on the canton of Lucerne’s own reserve calculation.

  • Built today about 1.52 million m² of floor area, permitted under the zone 2.28 million m²: utilisation 67 %
  • Reserve 1.08 million m², of which 0.57 million m² on 457 plots used to less than half and 0.28 million m² on 127 undeveloped plots
  • 263 plots exceed the zone limit (existing rights) and do not count towards the reserve
  • Largest reserves: residential zone C (249,000 m²), D (133,000 m²), B (125,000 m²)
  • Mobilised by 2050: room for about 6,600 additional residents, roughly twice the FSO projected increase of 3,100
Sources: canton of Lucerne, potential building volume per plot (OGD); FSO population scenarios; SPEKTRUM assumptions on mobilisation and residential share. Arithmetic reserve under the zone rules, no statement on whether an individual plot can be built on.
5Scenarios & variants

Compare inward development, with a zero option.

Compare up to eight development variants of a perimeter: density, use mix, residents and jobs, space users per hectare, demand coverage against the FSO forecast, parking and compliance with standard building rules. With a map from the official survey and transfer into the Art. 47 RPV planning report.

SPEKTRUM methodRule set with thresholds and legal basis for strengths and weaknesses, RPG check under Art. 1 and 3, zero option as automatic reference; an overall ranking only with explicit weighting.
  • Compare three density variants for the station area.
  • Which variant best covers demand up to 2040?
  • Give me the variants as a map for QGIS.

Services: bauzone

Examplereal query of 14.10.2026, shortened
Compare three variants for a station area in Hinwil (1.2 ha, 45 residents today): FAR 0.7 housing only, FAR 1.0 with 20 % jobs, FAR 1.4 with 30 % jobs. The area is meant to take 20 % of growth up to 2040.
vergleiche_varianten
  • Additional demand for the area up to 2040: 305 residents (20 % of 1,525)
  • A, FAR 0.7: +61 residents, 105 space users/ha, covers 20 %
  • B, FAR 1.0: +85 residents, +29 jobs, 149 space users/ha, covers 28 %
  • C, FAR 1.4: +117 residents, +69 jobs, 209 space users/ha, covers 38 %
  • All variants meet inward development under Art. 1 para. 2 RPG; the weakness is high parking demand (0.66 to 0.75 spaces per space user)

No variant covers the intended demand on its own. Weighting remains part of the weighing of interests.

Sources: FSO STATPOP and population scenarios, VSS 40 281, RPG Art. 1, 3 and 15; perimeter data from the question
6Neighbourhood in 3D

The neighbourhood today and in 2070, building by building.

An address is enough. The assistant builds a rotatable 3D model within a radius of 150 to 800 m: buildings from the official cadastral survey with storeys, year of construction, dwellings and heating from the building register, plus zoning plan and public transport quality classes. A time slider shows how the neighbourhood could develop by 2070: under current law, under the draft of an ongoing revision (Canton of Zurich), or with additional upzoning. For figures without a 3D model, the building register search returns construction periods, building types and flats within up to 500 m.

SPEKTRUM methodScenario under current law, building by building: older residential buildings are replaced up to the permitted storeys from the recorded building regulations, core and protection zones stay unchanged, heating reaches net zero by 2040, plus photovoltaics and new street trees. It shows what the rules allow, not what the market builds. Every assumption is disclosed.
  • Show me the neighbourhood around Albisriederstrasse 360 in Zurich in 3D, today and in 2070.
  • What would upzoning by one storey bring in this neighbourhood?
  • How many oil and gas heating systems are there within 800 m?

Services: bauzone, with ch-bund and the cantonal geodata

More on the neighbourhood in 3D: data, rules, limits
Examplereal query of 24 Oct 2026, shortened
Show me the neighbourhood within 800 m of Albisriederstrasse 360, 8047 Zurich in 3D, today and in 2070. What does the draft zoning revision change, and what would one or two more storeys bring?
quartier_3d
Preview: rotate, zoom, click buildings, play the timelineFull view with key figures (German) ↗

Radius of 800 m in Zurich-Albisrieden: 1,645 buildings, 7,034 dwellings, 4.3 storeys on average, 853 oil and gas heating systems. The draft zoning revision (public exhibition 2026) changes the zone of 676 buildings, mainly from W4 to W5b and W5c.

  • Current zoning: 335 replacement buildings by 2070, only 44 of them taller; floor area +0.4 %
  • Draft zoning: 356 replacement buildings, 187 of them taller; floor area +2.4 %
  • Draft +1 storey: 429 replacement buildings, 356 of them taller; floor area +6.3 %
  • Draft +2 storeys: 459 replacement buildings, 429 of them taller; floor area +10.9 %
  • In all variants: no oil or gas heating from 2040, photovoltaics on 1,101 roofs, 776 new street trees; the core zone stays unchanged

Under current law the neighbourhood is largely built out. The draft multiplies the gain by six but stays at a few per cent. The draft is not yet legally binding.

Sources: official cadastral survey (geodienste.ch), building register (FSO), zoning plan Canton of Zurich (OGD), public transport quality classes ARE, building regulation corpus SPEKTRUM MCP · scenario under current law
7Building permits

A pre-check before the application lands on the desk.

Check zone conformity, look up parameters in the building regulations, calculate parking requirements, determine deadlines and find the applicable standards. For building authorities and project teams alike. Building regulations are recorded for 2,078 municipalities (complete for 81% of the building zone area), deadline plans and procedure profiles for all 26 cantons. Also drafts of building and objection decisions with the notice of appeal taken from cantonal law, answers to cantonal preliminary reviews and the noise comparison at the plot. A submitted plan set as PDF is checked for completeness under cantonal law, and the dimensions in the plans are compared with the building regulations, each value with its location in the plan.

SPEKTRUM methodHand-recorded parameter tables from building regulations, check rules based on IVHB and a deadline calculator that backs every deadline with its legal paragraph. For plan sets, the cantonal rules on application documents with their provisions: a value without a location in the plan is not checked, and a value measured off the drawing is never reported as compliant.
  • Is a commercial building with a residential share allowed in this zone?
  • How many parking spaces does a block of 14 flats need?
  • By when must the municipality decide on the application?
  • Is this plan set complete, and do the dimensions in the plans comply with the regulations?

Services: bauzone

Examplereal query of 14.10.2026, shortened
Pre-check: replacement building with 14 flats in residential zone D in Kriens, 4 full storeys, flat roof, facade height 13 m. Submission on 2 November.
baureglement_abfragenpruefe_zonenkonformitaetberechne_parkplatzbedarfbaugesuch_fristen
  • Zone: residential zone D, noise sensitivity level II; parameters from the cantonal zoning plan (indicative)
  • Facade height 13 m: not compliant (max. 12 m)
  • Note: the zoning plan still lists an old floor area ratio (AZ 0.55); check the conversion of the building regulations to IVHB
  • Parking: base demand of 16 spaces under VSS 40 281, no reduction; the municipal regulation takes precedence
  • Deadlines with publication on 16.11.2026: objection period until 7.12., target decision 30.12.2026
Sources: zoning plan Kriens in the cantonal data model (canton of Lucerne), building regulations Kriens, PBG LU §§ 193–196, PBV LU § 63, VSS 40 281
ExampleTrial run with a test plan set, 26.10.2026, shortened
Here is the plan set as PDF, 24 pages. Is it complete, and do the dimensions in the plans comply with the regulations?
plandossier_pruefen

Checked under § 188 PBG and §§ 55 f. PBV LU, dimensions under the building regulations of Kriens (as of 12 March 2026), zone W-D.

  • Incomplete: missing are the drainage plan (§ 55(2)(e) PBV), the earthquake safety declaration (g), the calculation of the density figures, because the zone has a floor area ratio of 0.55 (i), and the waste disposal statement (j–k)
  • Site plan: boundary distance to the north-east not dimensioned (a)
  • Contradiction: facade height 13.0 m in section A–A (plan 301), 12.6 m in the south elevation (plan 401); checked with the less favourable value
  • Facade height against max. 12 m: conflict with both values; adjust the project or justify an exemption
  • Open: fire protection plans only for higher-risk buildings as required by the building insurer

This becomes the draft request for missing documents to the applicant, each item with its paragraph.

Sources: PBG LU § 188, PBV LU §§ 55–56, building regulations Kriens; values from the test plan set, each with its plan number
8Parking

How many parking spaces a project needs, and how many it may have.

The assistant calculates the threshold demand per use for residents, employees and visitors, based on the standard VSS 40 281, and from it the range of permitted supply by location type A to D. It derives the location type from the federal public transport quality class; if you know it from the regulation, you enter it directly. Housing, services, retail, trade, storage and restaurants can be mixed in one calculation. For accessible parking spaces, bicycle parking and special uses such as schools or hospitals it points to the basis rather than giving a number.

SPEKTRUM methodCalculation rules for threshold demand and reduction that follow the method of the standard without containing its text. Every output states what is derived heuristically and what is an indicative value from regional practice; the municipal parking regulation or the cantonal enactment prevails.
  • How many parking spaces does a two-family house need at a location with public transport quality class D?
  • How many parking spaces may an office building of 2,000 m² next to the station have?
  • What changes if the regulation also reduces residential parking?

Services: bauzone

Examplereal query of 16 Nov 2026, shortened
How many parking spaces does a new building with 12 flats (1,400 m² floor area), 400 m² of offices and a 250 m² neighbourhood shop need, and how many may it have? The location has public transport quality class B.
berechne_parkplatzbedarf

Threshold demand 31.7 parking spaces, permitted supply 19 to 23. Location type A, derived heuristically from public transport quality class B and to be verified with the municipality.

  • Housing (1,400 m²): 14 spaces for residents, 1.4 for visitors
  • Offices (400 m²): 5 for employees, 1.3 for customers
  • Neighbourhood shop (250 m², customer-intensive): 1.7 for employees, 8.3 for customers
  • Shares of threshold demand at location type A: residents 100%, employees 20 to 45%, visitors and customers 30 to 50%
  • Housing stays at 100% under the standard; if the regulation also reduces housing, the switch “reduce housing” includes it

The threshold demand is the starting figure, not a number to build. Whether the minimum must be built or the maximum applies is set by the municipal parking regulation.

Sources: reference values based on VSS 40 281 (2019); reduction ranges as indicative values from regional practice (Agglo Obersee 2023, guidance of the Canton of Zurich building department) · indicative, the municipal regulation prevails
9Building outside the building zone

Outside the building zone: what federal law allows.

For projects outside the building zone the assistant first checks the switch according to the ÖREB cadastre, then the responsible cantonal authority and the cases under Art. 16a and 24 to 24e RPG with the limits of Art. 42 RPV. Plus the mandatory site checks (forest, water, hazards, crop rotation land, inventories) and the structure plan chapters. For holiday and second homes, the Second Homes Act also applies, with the municipality’s share from the ARE housing inventory.

SPEKTRUM methodCheck scheme with rules from RPG, RPV and cantonal law (LU and GR in detail), per case «speaks for», «speaks against» or «open». Missing details come back as questions instead of guesses. There is deliberately no overall traffic light: balancing and decision lie with the cantonal authority.
  • May the house protected by prior law in the agricultural zone be extended by 30 m²?
  • Can the barn be converted into a holiday flat?
  • Does the Second Homes Act apply in Flims to the conversion of this flat?

Services: bauzone, with ch-bund and the cantonal geodata

Examplereal query of 26 Oct 2026 with sample data, shortened
May a house from 1960 protected by prior law in Knutwil (LU, agricultural zone, 120 m² gross floor area) be extended by 30 m² outside its volume?
pruefe_ausserhalb_bauzonepruefe_zweitwohnung

Plot 381 in Knutwil, agricultural zone according to the ÖREB cadastre: the project lies outside the building zone. The responsible authority is the Department for Spatial Planning and Economy (§ 51 PBV LU); without its decision a building permit would be void (§ 182 PBG).

  • Case Art. 24c RPG (building protected by prior law): lawfully built, before allocation to the non-building area, usable as intended, inhabited; these conditions are met
  • Extension outside the volume: 30 m² counted, limit 36 m² (30 % of the area, at most 100 m², Art. 42(3) RPV), so within
  • Open: gross ancillary area at the time of allocation (cellar, attic, garage) for the total area; the assistant asks instead of guessing
  • Mandatory checks: crop rotation land affected, to clarify; forest, water area, groundwater and natural hazards without entry
  • Structure plan LU: chapters L5 building outside the building zone, S4 hamlets, L6 agriculture
  • Second homes, example Flims: share 70.9 %, extending a flat protected by prior law by 25 m² is permitted because it stays below 30 % of the 2012 area (Art. 11 ZWG)

The extension lies within Art. 42 RPV; before the application, clarify the ancillary areas and discuss the crop rotation land with the department. Decision and balancing remain with the canton.

Sources: ÖREB cadastre LU (binding), RPG and RPV (Fedlex), PBG and PBV LU, structure plan LU, ARE housing inventory, ZWG
10Law & procedure

Statute, procedure and appeals, each with its citation.

Federal law article by article from Fedlex (40 acts from the RPG to the USG, including the annexes of the LSV), cantonal law from all 26 cantons and the procedure per canton: land-use planning, special-use plans, building permits, planning zones, value capture, appeals and deadlines, every statement with its section. Plus 50 guidance documents and a citation check that looks up every court reference before it is used.

SPEKTRUM methodProcedure profiles for all 26 cantons, backed by cantonal law; fields without a source are marked as such. The assistant only cites references that the citation check has confirmed.
  • What does Art. 24c RPG say about buildings protected by prior law?
  • Which appeals exist in the canton of Lucerne against a building permit, and within what deadline?
  • How does a full revision of local planning work in the canton of Graubünden, and how long does it take?

Services: bauzone

Examplereal query of 25 Oct 2026, shortened
How does a partial revision of land-use planning work in the canton of Graubünden if we start in January 2027, and what applies to the planning zone?
verfahren_abfragen

Indicative schedule from 4 Jan 2027: 13 steps, about 19 months until entry into force on 11 Aug 2028. Statutory deadlines with their citation, all other durations marked as assumptions.

  • Cantonal preliminary review: 2-month target period for simple partial revisions (Art. 12(3) KRVO), from complete documents
  • Public consultation 30 days (Art. 13 KRVO); Graubünden has no objection procedure against the basic plan
  • Adoption by the voters (Art. 48 KRG), then 30 days of appeal display with a planning appeal to the cantonal government (Art. 101 KRG)
  • Approval by the cantonal government; preliminary review and approval together at most 8 months (Art. 49(4) KRG)
  • Planning zone: issued by the municipal executive for 2 years, extendable with the department’s consent; projects must comply with current and future law (Art. 21 KRG)

Until approval, the municipal decision has the effect of a planning zone by law (Art. 48(6) KRG). Further appeal to the High Court within 30 days.

Sources: KRG (BR 801.100), KRVO (BR 801.110), VRG (BR 370.100), official version gr-lex, retrieved 12 Oct 2026
11Decisions & regulations

Drafts that can go into a procedure without rework.

Building and objection decisions with a numbered operative part and a notice of appeal taken from cantonal law, the answer to a cantonal preliminary review point by point, regulation articles from cantonal model building regulations with a check of the IVHB terms, and the draft of a zoning plan change with area and capacity balance. Everything as a draft with review marks for the professional.

SPEKTRUM methodThe notice of appeal comes only from the canton’s procedure profile and the deadline is matched against the statutory wording; where something is missing, a placeholder stands instead of a guess. Objectors appear only under a pseudonym.
  • Draft the building decision for this application, including the treatment of the two objections.
  • Answer the canton’s preliminary review report in a table.
  • How do I word the total height in our building regulations under the IVHB?

Services: bauzone

Examplereal query of 25 Oct 2026 with sample data, shortened
Draft the building decision for the replacement building with 14 flats in Kriens: permit with the condition of a 12 m facade height, two objections about shading and parking.
generiere_bauentscheid

Draft with heading, facts, considerations, operative part, conditions and notice of appeal, following the procedure profile of the canton of Lucerne.

  • Objections: settled together with the building decision (§ 196(1) PBG LU); standing under § 207 PBG, objectors only under a pseudonym
  • Shading and parking complaints: one text module each with citations from the corpus, the outcome stays [AUTHORITY DECISION]
  • Operative part: permit, condition of 12 m facade height, disposal of each objection, costs, service
  • Appeal: administrative court appeal to the Cantonal Court within 20 days (§ 206(1) PBG LU), deadline checked against the statutory wording
  • Deadlines: objection period until 7 Dec 2026, target date for the decision 30 Dec 2026 (§ 63 PBV LU)

Plus a review list with 29 [COMPLETE] and 18 [CHECK] marks, such as plan list, fees and addresses. Assessment and decision remain with the authority.

Sources: procedure profile LU, PBG LU (SRL 735), PBV LU (SRL 736), VRG LU, building regulations Kriens, RPG Art. 22 and 25a
12Calculations, proofs & shadow

Ratios, setbacks and shadow by the canton’s rule.

Floor-area ratios (GFZ, AZ, BMZ, ÜZ, GZ) with the canton’s convention, boundary, forest and water setbacks with the extra-length surcharge, shadow with duration of shading and a 3D shadow diagram (surroundings from the cadastral survey, sun by date and time, duration of shade per rule day, affected dwellings), area balance of rezoning, heights and slope, and the building zone utilisation under the Technical Guidelines for Building Zones. Every calculation shows formula, inputs and source.

SPEKTRUM methodDeterministic calculation modules instead of an AI estimate: conventions per canton backed by cantonal law, never a silent conversion between AZ and GFZ. What a canton does not provide is marked «not on file».
  • What is the GFZ for these floor areas, and what counts in the canton of Aargau?
  • Which boundary setback applies to a 26 m long building in Herisau?
  • How long is the neighbour in the shadow of this high-rise?

Services: bauzone

Examplereal query of 25 Oct 2026 with sample data, shortened; diagram of 6 Nov 2026
A 40 m building with a 30 × 20 m footprint is planned in Bern. How long are the three neighbouring facades to the north in shadow, and how does that compare with the canton’s rule?
schattenwurf
Preview: choose the rule day, drag or play the time of day, ground layer project only or with existing buildings, click dwellingsFull view with table of dwellings ↗

Stored rule for Bern: high-rise buildings over 30 m total height may shade dwellings for at most 2 h on 21 March and 2½ h on 8 February (Art. 22(3) BauV).

  • 21 March (07:30–17:30): northeast 1 h 50 min, north and northwest no shadow; all within the rule
  • 8 February (08:30–16:30): north 2 h 30 min (11:30–14:00), northwest 2 h 00 min; both within
  • Northeast on 8 February: 2 h 35 min (13:40–16:15), outside the stored rule
  • Shadow length on the winter day: about 75 m at noon, over 200 m at 9 am

Simplified prism model, without roof shapes. Since 6 November 2026 the same call also returns the 3D shadow diagram: surroundings from the cadastral survey with GWR storeys and terrain, duration of shade per rule day as a ground layer (project only or cumulative with existing buildings), area above the limit, affected dwellings with their hours of shade and the envelope as GeoJSON. The formal proof remains the planner’s job; the diagram is the working basis for it.

Sources: BauV BE Art. 22, BauG BE Art. 20, sun position after NOAA, swissALTI3D (swisstopo), cadastral survey and GWR for the surroundings; building and measuring points from the question
13Noise, energy & climate

What lies on the plot, down to the limit values.

Road and rail noise at the façade sides of the plot compared with the planning, immission limit and alarm values of the sensitivity level, with reference to Art. 22 and 24 USG and Art. 29 and 31 LSV. Plus 75 federal layers in the plot assessment: second-home share, sectoral plans, federal inventories, major-accident risk, aircraft noise, energy (thermal networks, solar potential, Minergie) and climate data. Since November 2026 also air quality at the site (annual means of NO₂, PM10 and PM2.5 from the FOEN against the immission limit values of the LRV) and the yield of a photovoltaic system from the EU Commission’s PVGIS: annual and monthly yield, kWh per kWp, tilt and orientation free or optimised, the typical meteorological year on request.

SPEKTRUM methodLimit values from federal law (Fedlex, as of 1 April 2026) instead of from memory, a traffic light per façade side, findings only with source and data date. The levels are model values and do not replace the determination under Annex 2 LSV.
  • How loud is it at this plot, and does the project need a noise report?
  • Is the plot in a municipality with a second-home share above 20 percent?
  • Which federal inventories and sectoral plans touch the plot?
  • How much electricity would a 10 kWp system on this roof produce, 30 degrees facing south?

Services: bauzone, ch-bund

Examplereal query of 25 Oct 2026, shortened
How loud is it at Birmensdorferstrasse 200 in Zurich, and what does that mean for a new building?
laerm_vergleich

Plot WD8622 in Zurich, noise sensitivity level III according to the ÖREB cadastre. Limits day/night: planning value 60/50, immission limit 65/55 dB(A).

  • At the address point on the street: 68.4 / 60.2 dB(A), immission limit exceeded by 5.2 dB
  • North and south edges also above: 65.1 / 51.9 and 66.5 / 58.3 dB(A)
  • East side, west side and plot centre: 43 to 50 dB(A) by day, well below the planning value
  • Railway noise below 15 dB(A), no entry in the aircraft noise cadastre

A new building needs a noise report: orient noise-sensitive rooms to the quiet east side or shield them (Art. 31(1) LSV), otherwise only under the conditions of Art. 22(2) USG.

Sources: sonBASE noise model FOEN (reference year 2021), ÖREB cadastre ZH, LSV Annex 3 and USG as in force since 1 Apr 2026 (Fedlex)
14Value capture

Calculate the value capture levy, for single plots or whole areas.

Estimate planning gains from new zoning, rezoning and upzoning under Zurich law (MAG), using the municipality’s zone factors, and value several plots at once. Plus the value capture status of every Zurich municipality.

SPEKTRUM methodCalculation model for planning gains with zone factors per municipality and openly stated assumptions.
  • What levy results from upzoning W2 to W3 for these five plots?
  • Where in the canton of Zurich does a municipal value capture apply?

Services: ortsplanung

Examplereal query of 25 Oct 2026 with sample data, shortened
Estimate the value capture levy for the upzoning in the centre of Uster, plot list attached (five plots, 820 to 3,900 m²).
get_zonenfaktorenbatch_bewertung

Model calculation with a land value of CHF 500/m² and zone factors relative to W2; levy rate 30 %, allowance CHF 100,000.

  • Plot 4110, 2,300 m², W2 → W4: added value CHF 230,000, levy CHF 39,000
  • Plot 4114, 3,100 m², W2 → W4: added value CHF 310,000, levy CHF 63,000
  • Plot 4118, 3,900 m², WG3 → WG4: added value CHF 195,000, levy CHF 28,500
  • Plots 4101 and 4105, W2 → W3: added value CHF 41,000 and 72,500, below the allowance, no levy
  • Total: added value CHF 848,500, levy CHF 130,500 (range CHF 103,500 to 157,500)

The range reflects the uncertainty of zone factors, land values and adjustments. Land value and levy rate can be changed; the formal ruling needs a valuation under cantonal law.

Sources: MAG/MAV ZH, municipal rules Uster, zone factors and land value model of the ortsplanung service; plots from the list
15Case law search

Describe your project, find relevant rulings.

Describe your project in your own words. The assistant searches the rulings of the Federal Supreme Court and all cantonal courts, including administrative and building appeal courts, and summarises how similar cases were decided. Every hit with headnote and link to the original ruling.

SPEKTRUM methodCurated case law collection of the Case Law Search with its own headnote per Federal Supreme Court ruling, indexed by topic, planning occasion, protected interest and outcome; plus the daily full-text search across all courts.
  • We want to convert an old farmhouse outside the building zone into flats. Are there rulings on this?
  • How have courts decided objections to mobile phone antennas in residential zones?
  • Are there recent rulings on the water area for replacement buildings?

Services: spektrum

Examplereal query of 14.10.2026, shortened
We want to convert an old multi-purpose farmhouse in the agricultural zone into several flats and extend it slightly. Are there rulings on this?
rechtsprechung_korpus_suchenrechtsprechung_suchen

In the curated collection 183 rulings on Art. 24c RPG (appeal success rate 25 %), plus 22 cantonal rulings in the full-text search. The most relevant:

  • Building appeals court ZH, BRGE IV No. 0016/2022: conversion of a listed multi-purpose farmhouse into seven flats rejected; the extension exceeded the limit under Art. 42 para. 3 RPV
  • Administrative court SG, B 2015/100: extension for contemporary residential use accepted in this case, referred back because the question of usability remained open
  • Administrative court SG, B 2015/99: protection of existing buildings denied because the building was no longer usable when demolished

Common thread: extensions remain bound by the limits of Art. 42 para. 3 RPV, and the existing building must be usable as intended. Check rulings in the original before using them.

Source: entscheidsuche.ch (Federal Supreme Court and cantonal courts, updated daily), with a link to each original ruling
16Weighing, EIA & case law

Weighing of interests and EIA screening backed by case law.

Start a weighing of interests under Art. 3 RPV, check a project for EIA obligation and cross-check it, find relevant Federal Supreme Court rulings, query structure plans and cantonal law.

SPEKTRUM methodWeighing of interests with five specialised agents, EIA checklist based on the EIA Ordinance and a curated case law collection with headnotes.
  • Does the gravel pit extension require an EIA?
  • Which rulings exist on zoning crop rotation areas for building?
  • Start a weighing of interests for the attached project description.

Services: spektrum, bauzone

Examplereal query of 25 Oct 2026, shortened
Which Federal Supreme Court decisions exist on zoning crop rotation land as building land?
rechtsprechung_korpus_suchen

7 decisions on zoning crop rotation land in the curated corpus, 5 of them from the Federal Supreme Court; 4 appeals dismissed, 3 upheld. The most relevant:

  • BGE 145 II 18: new building zones during the transition period only under the strict requirements of Art. 52a RPV; demand under Art. 15 RPG must be shown, inward development first
  • BGer 1C_635/2020: zoning refused because the plot is partly crop rotation land and Art. 30(1bis) RPV was not met
  • BGer 1C_306/2022: referred back because the demand for building land was incompletely established, so the balancing of interests did not hold
  • BGer 1C_235/2020: the inventory of crop rotation land follows quality criteria only; balancing takes place when the land is used

Common line: without a complete demand assessment and proof that the goal cannot reasonably be reached without crop rotation land (Art. 30(1bis) RPV), zoning does not hold. Check decisions in the original before use.

Source: curated case-law corpus of the Urteilssuche (4,790 decisions, as of 11 Oct 2026), with a link to each original decision
17Participation & reports

From submissions to the participation report.

Break down submissions from public participation under Art. 4 RPG, group them by topic and propose responses. Turn analyses into reports, recommendations and proposals for authorities.

SPEKTRUM methodAnalysis method following local planning practice: break down submissions, group them, propose responses in the usual categories.
  • Group the 86 submissions on the land-use plan revision by topic.
  • Write a proposal to the municipal council on the partial revision.

Services: bauzone

Examplereal query of 25 Oct 2026 with sample data, shortened
Evaluate the eight submissions on the partial revision Bahnhof Süd attached and prepare the consultation report.
mitwirkung_auswerten

8 submissions from 56 participants, broken down into 7 concerns; E02 and E03 recognised as a form letter and handled together.

  • Traffic and parking: 2 concerns, 49 participants (neighbourhood association: square, trees, bicycle parking; commuter parking)
  • Settlement and density: 2 concerns, 4 participants (four instead of five storeys, shading, more green space)
  • Housing: at least 30 % affordable flats
  • Environment and climate: daylight the stream, keep the water area free, green roofs
  • Individual plots: request to include another plot

This yields the skeleton of the consultation report with a register table. The assistant proposes a category per concern (taken into account / partly / not taken into account) with reasons; political decisions stay open as [MUNICIPAL DECISION].

Basis: your submissions (anonymised), planning proposal, RPG Art. 4
Who it is for

For everyone who works with zones, plots and permits every day.

Municipalities & building authorities

Information at the counter, pre-checking applications, deadlines in view.

Typical: «What may I build on my property?» answered quickly, with sources.

Planning firms

Feasibility studies, groundwork for local plan revisions, capacity statements, draft reports.

Typical: the feasibility of a plot in an afternoon, with a source for every figure.

Cantons & specialist offices

Comparison across municipalities, case law, EIA questions.

Typical: cross-checking an EIA screening against the relevant rulings.

Access and pricing

SPEKT-AI
CHF 0 no account

Information on the SPEKTRUM products, prices and solutions. Ready to use immediately, no sign-up.

SPEKTRUM MCP Full
CHF 98 per month
Try free for 30 days

All services in one package: federal geodata, building zone capacity with building application pre-check, GIS Zurich, geodata Lucerne and Graubünden, value capture, weighing of interests and EIA screening.

SPEKTRUM MCP Students
CHF 0 for students

For students at ETH, UZH, ZHAW, FHNW, OST, GIBB and other universities: the professional tools for geodata, building zones, building regulations and case law, free for 6 months.

Set-up

Connected in five minutes.

Each person in your firm has their own login (e-mail and password), and five people are included in the subscription. You get the credentials from the person who manages the subscription. The address is the same for all assistants:

https://mcp.spekt.ch/mcp

Connection point for the AI assistant, not a website: copy the address and enter it in the assistant as a connector. Opened in a browser it only shows an error message.

Claude (web and desktop)

  1. Settings → Connectors → «Add connector»
  2. Name «SPEKTRUM MCP», paste the address above, «Add», then «Connect»
  3. In the sign-in window enter your own e-mail and password, «Allow access»

Requires a paid Claude plan (Pro, Team or Enterprise). In Team and Enterprise, admins usually set up the connector for everyone.

ChatGPT

  1. Open «Plugins» → «+» → «Add custom MCP server»
  2. Name «SPEKTRUM MCP», server URL above, authentication «OAuth»; leave Client ID and Client Secret empty (no API key needed), confirm the warning, «Create as a plugin»
  3. Install the plugin; in the mcp.spekt.ch sign-in window enter your e-mail and personal password, then select it in the chat with «@»

Requires ChatGPT Business, Enterprise or Edu in the browser; in Business workspaces admins create the plugin. The former «Developer Mode» is no longer needed.

Microsoft 365 Copilot

  1. In Copilot Studio open an agent → Tools → «Add tool» → «Model Context Protocol»
  2. Server URL above, authentication «OAuth 2.0», method «Dynamic discovery»
  3. Sign in, test and publish to Copilot or Teams

Requires an M365 Copilot licence and Copilot Studio, usually via your IT.

How to ask well

  • Name the place precisely: address, municipality and canton, or plot number with municipality.
  • State the goal: «for a counter enquiry», «as a paragraph for the planning report», «as a table».
  • Ask for sources: «with a source for each statement». The assistant names the dataset, article or ruling.
  • Follow up: keep asking in the same conversation, e.g. «and what does that mean for the floor area ratio?».
Limits

What the access cannot do.

So you can read the answers correctly.

No official statement

Answers replace neither the certified ÖREB extract nor a ruling or decision of the competent authority.

Facts, not neighbourhood quality

The analyses rest on registers, models and geodata: law, environmental risks, noise, access, energy and climate. The traffic light rates these topics, not the suitability of a place. Social and soft qualities such as neighbourhood, local character, sense of safety, quality of stay and acceptance are not included and are expressly stated in the report as «not part of this analysis». That takes a site visit, conversations and participation.

The assistant can be wrong

The data comes from official sources, but the AI writes the summary. Check important statements against the named source.

Coverage by canton

In depth: ZH, LU, GR, SG, AG, BE and VS. The other cantons via the cantonal thematic maps, with fewer topics. Federal data (swisstopo, ÖREB) covers all of Switzerland. Building zone capacity for all 2,110 municipalities, zones from cantonal zoning plans for 1,682 municipalities in 21 cantons, hand-recorded building regulations with parameter tables for 2,078 municipalities (1,829 complete, 249 partial); complete for 81% of Switzerland’s building zone area. Law: 40 federal acts from Fedlex and 314 cantonal acts from all 26 cantons, procedure and appeal profiles with citations for all 26 cantons, 50 guidance documents.

Building regulations and deadlines

Zone parameters are only available for municipalities already recorded (recorded by hand for 2,078 municipalities, e.g. Winterthur, Lucerne, St.Gallen, Chur, Aarau and Frauenfeld; indicatively from cantonal zoning plans for 1,682 municipalities), deadline plans for building permits for all 26 cantons, in depth for LU, GR, SG, AG, BE and VS. If something is missing, the assistant says so; we add it on request.

As current as the source

Geodata is queried from the portals. Ongoing revisions that are not yet published are unknown to the system.

Read and calculate only

The access enters nothing into official systems, submits nothing and sends nothing.

Quota

The firm has one shared monthly call quota for all people together and at most 30 calls per minute. At «monthly limit reached» it renews at the start of the month; more on request.

Your input

What you type or upload in the chat is processed by your AI provider (e.g. Anthropic, OpenAI, Microsoft) under its terms. The SPEKTRUM MCP only receives the individual tool calls, such as an address or municipality. Do not enter confidential personal data.

Questions or trouble connecting: andreas.rupf@spekt.ch

What data the MCP collects, who receives it and how long it is kept: Privacy policy SPEKTRUM MCP

Questions

Frequently asked questions about the SPEKTRUM MCP.

Short answers for the decision in your office.

What is the SPEKTRUM MCP?

The SPEKTRUM MCP is a server based on the Model Context Protocol that connects AI assistants such as Claude, ChatGPT and Microsoft 365 Copilot with 148 tools for Swiss spatial development: official geodata and the PLR cadastre (ÖREB), cantonal thematic maps, building zone capacity under Art. 15 RPG, building permit pre-checks, value capture levies, weighing of interests, EIA screening and case law. It is operated by SPEKTRUM Partner GmbH in Zurich.

What does the SPEKTRUM MCP cost?

The SPEKT-AI service with product information is free. The full subscription with all nine services and 148 tools costs CHF 98 per month for one office with up to five people (each with their own login), with a shared monthly call quota. You also need a suitable plan with your AI provider, because connectors are only available in paid plans (see set-up).

Which AI assistants does it work with?

With every client that supports remote MCP servers with OAuth: Claude (web, desktop and Claude Code), ChatGPT (as a plugin), Microsoft 365 Copilot via Copilot Studio, and developer tools such as Cursor or VS Code. The address is the same everywhere: https://mcp.spekt.ch/mcp. You sign in with your personal SPEKTRUM login.

Which cantons and data are covered?

Federal data from swisstopo and the PLR cadastre apply nationwide, as does building zone capacity for all 2,110 municipalities. Cantonal thematic maps exist for all 26 cantons, in depth for Zurich, Lucerne, Graubünden, St.Gallen, Aargau, Bern and Valais. Zones from the cantonal zoning plan are available for 1,682 municipalities in 21 cantons, hand-recorded building regulations for 2,078 municipalities (complete for 81% of the building zone area). In addition federal law from Fedlex, cantonal law and the procedure profiles of all 26 cantons.

Are the answers legally binding?

No. The SPEKTRUM MCP is a working aid. The data comes from official sources and every statement carries its source, but the summary is written by the AI assistant. The certified PLR extract, the ruling and the decision of the competent authority remain binding. Check important statements against the source given.

What happens to my data?

Your chat input is processed by your AI provider (Anthropic, OpenAI, Microsoft) under its terms. The SPEKTRUM MCP only receives the individual tool calls, such as an address or a municipality, and is read-only: it enters nothing into official systems, submits nothing and sends nothing. Confidential personal data does not belong in the chat.

How does it differ from open geodata MCP servers?

Open servers for swisstopo or geo.admin.ch deliver federal layers. The SPEKTRUM MCP adds cantonal thematic maps for all 26 cantons, recorded building regulations, prepared planning and building law, case law and the professional logic from planning practice: building zone capacity, permit pre-check, value capture levy, site analysis and weighing of interests, each with finding, source and legal basis.

Do I need programming skills?

No. You add the address once as a connector in your assistant and sign in with your personal login. After that you ask in plain language, for example "What applies to the plot at Bahnhofstrasse 12 in Uster?". The assistant handles the rest: choosing the tools and citing the sources.

Get started

Connected? Then try it with a case of your own.

Take a plot or an application you are working on right now and ask the question the way you would ask a colleague.